Tier-1 Apparel Fulfillment (Bay Area)
A 480,000 sq ft fulfillment center that stopped bleeding shrink.
Replaced a seven-year-old DVR and analog-camera deployment with a fully AI-native vision network, segmented OT/IoT switching, and 24/7 Cortex monitoring. Shrink losses fell 72% in the first quarter post-cutover. Peak-season throughput increased 18% because dock assignments became algorithmic instead of radio-based.