Electrical work that's ready for what you haven't built yet.
Service upgrades, panel work, UPS, EV chargers, solar interconnections, and backup power — all under our C-10 license, all coordinated with the low-voltage and network work on the same job, all sized for where your building is going, not just where it is.
Service promise
“The panel is an investment. Treat it like one.”
Signature outcomes
- 100%First-inspection pass rate, 2024-25
- 26%Avg. energy savings post-upgrade
- 48moTypical payback with smart loads
Your 200-amp service was perfect — in 2005.
Most commercial buildings are now running cameras, servers, HVAC, EV chargers, and maybe a kitchen or two through infrastructure designed before any of that existed. We do the electrical engineering and field work that lets you layer modern loads without burning anything down or failing an inspection.
Traditional vs. ANI on this service
| Dimension | Traditional | ANI Networks |
|---|---|---|
| Sizing | Nameplate math, no margin. | Metered load data, 10-year growth baked in. |
| Coordination | Electrician shows up after the rough-in is done. | Same company runs low-voltage, network, and electrical. |
| Metering | Utility meter, done. | Circuit-level metering, dashboard, anomaly detection. |
| Docs | Hand-drawn panel schedule taped inside the door. | Portal-delivered single-line, labeled panel, audit-ready. |
The full C-10 stack, coordinated with the rest of the job.
Service + panel upgrades
400A, 600A, 1200A — coordinated with the utility, permitted under our C-10, executed with minimal tenant disruption.
UPS + backup power
Rack-level, building-level, generator-coupled — sized with real load studies, not manufacturer datasheets.
EV charging
Commercial Level 2 and DC fast-charge installations — with the load management, signage, and billing integrations that turn them into an amenity, not a liability.
Solar + storage interconnects
We don't sell the panels — we do the interconnect, panel upgrades, and metering that make someone else's solar install actually code-compliant and monitored.
Engineered work that passes the first inspection.
- Step 01
Load study + single-line
Real, metered load data — not nameplate sums. We size for 10-year growth, not your invoice today.
- Step 02
Permit + execute
Drawings stamped when needed, permits pulled under our license, utility coordination — all inside the same Cortex project.
- Step 03
Commissioning
Breaker labeling, metering, smoke-test documentation, and a handover bundle your insurance adjuster will be happy with.
Infrastructure that pays for itself — in receipts, not rhetoric.
Clients typically recoup smart-power upgrades in 36-48 months through demand-charge avoidance, load-shifting, and avoided emergency service — plus qualifying rebates we help you capture.
Let's build infrastructure that thinks.
Bring us a site walk, a floor plan, or a problem you're tired of re-explaining to three different vendors. We'll return a scoped, quoted, AI-native plan — usually within a week.