Skip to content
ANI.Networks
05 · Service

Electrical work that's ready for what you haven't built yet.

Service upgrades, panel work, UPS, EV chargers, solar interconnections, and backup power — all under our C-10 license, all coordinated with the low-voltage and network work on the same job, all sized for where your building is going, not just where it is.

Service promise

The panel is an investment. Treat it like one.

Signature outcomes

  • 100%First-inspection pass rate, 2024-25
  • 26%Avg. energy savings post-upgrade
  • 48moTypical payback with smart loads
The problem

Your 200-amp service was perfect — in 2005.

Most commercial buildings are now running cameras, servers, HVAC, EV chargers, and maybe a kitchen or two through infrastructure designed before any of that existed. We do the electrical engineering and field work that lets you layer modern loads without burning anything down or failing an inspection.

Comparison

Traditional vs. ANI on this service

DimensionTraditionalANI Networks
Sizing
Nameplate math, no margin.
Metered load data, 10-year growth baked in.
Coordination
Electrician shows up after the rough-in is done.
Same company runs low-voltage, network, and electrical.
Metering
Utility meter, done.
Circuit-level metering, dashboard, anomaly detection.
Docs
Hand-drawn panel schedule taped inside the door.
Portal-delivered single-line, labeled panel, audit-ready.
Capabilities

The full C-10 stack, coordinated with the rest of the job.

  • Service + panel upgrades

    400A, 600A, 1200A — coordinated with the utility, permitted under our C-10, executed with minimal tenant disruption.

  • UPS + backup power

    Rack-level, building-level, generator-coupled — sized with real load studies, not manufacturer datasheets.

  • EV charging

    Commercial Level 2 and DC fast-charge installations — with the load management, signage, and billing integrations that turn them into an amenity, not a liability.

  • Solar + storage interconnects

    We don't sell the panels — we do the interconnect, panel upgrades, and metering that make someone else's solar install actually code-compliant and monitored.

How we run it

Engineered work that passes the first inspection.

  1. Step 01

    Load study + single-line

    Real, metered load data — not nameplate sums. We size for 10-year growth, not your invoice today.

  2. Step 02

    Permit + execute

    Drawings stamped when needed, permits pulled under our license, utility coordination — all inside the same Cortex project.

  3. Step 03

    Commissioning

    Breaker labeling, metering, smoke-test documentation, and a handover bundle your insurance adjuster will be happy with.

Expected impact

Infrastructure that pays for itself — in receipts, not rhetoric.

Clients typically recoup smart-power upgrades in 36-48 months through demand-charge avoidance, load-shifting, and avoided emergency service — plus qualifying rebates we help you capture.

100%First-inspection pass rate, 2024-25
26%Avg. energy savings post-upgrade
48moTypical payback with smart loads
Ready when you are

Let's build infrastructure that thinks.

Bring us a site walk, a floor plan, or a problem you're tired of re-explaining to three different vendors. We'll return a scoped, quoted, AI-native plan — usually within a week.